Jason Baldwin
UKC Forum Member
Registered: Jan 2011
Location: Rockmart, Ga.
Posts: 2652 |
quote: Originally posted by Allen / UKC
Jason, never mind my previous comments. Thought you were referencing an RQE.
I've found that you are referring to your clubs February 3rd event. You might want to check with the club officials as our records do not support your statements. The date was scheduled for your club but the club is required to confirm it (provide UKC with deadlines and entry fees). Ten days before the scheduled date, it was too late to confirm it. All February events needed to be confirmed by December 1st so. The reason for this is; December 1st was the deadline for the January Issue of CB. All February Upcoming events are listed in the January issue.
We can certainly look at scheduling an additional date for the one that was not confirmed. That's not a problem, provided there's a date available that suits the club.
Check messages
__________________
For God so loved the world, that he gave his only begotten Son, that whosoever believeth in him should not perish, but have everlasting life. John3:16
Report this post to a moderator | IP: Logged
|