Kennel slope
My kennel is 36 feet long by 15 deep with an 8 inch slope on the 15 foot part,front to the back. I had another kennel off the end of the garage that had a 4 inch slope and 4 was not enough to have the urine run off fast enough in the summer time. If I was to build another it would be 8 inches of fall like I have now. As far as finishing the concrete,nothing but a smooth trial finish will do the job for me. I have seen the broomed finished kennels and when it comes to cleaning them, those little brush marks make for a real pain to get all the mess out of! JMO!! It works for me!!